Water Project




A pipe was inserted to the spring source to capture some of the water flowing out from the spring. This water was then routed to a primary collection/filter tank through a 20' long pipe. The filter tank was partially filled with pea pebbles, which act as a natural filter. The control valve at the bottom of the filter tank was connected flexible 500' long pipe. This flexible pipe was laid along forest floor to the main water tank. The main water tank can hold upto 3,000 gallons of water.  From the main tank, a pipe was connected to take the water to the first landing.